Overhead Crane / Honolulu Rail Transit

Structural analysis and design review for three outdoor overhead cranes. The cranes share the same track and service a segment precasting facility for the […]

Column Forms / Honolulu Rail Transit

HART Column Formwork Job Report (PDF) Structural analysis and design review for column forms up to 72 ft tall and 9 ft dia. for the Honolulu Authority […]

Pfeiffer Canyon Bridge / Big Sur California

Pfeiffer Canyon Bridge Launch Project Report (PDF) This 314 ft (96 m) long plate girder bridge was launched over Pfeiffer Canyon, with an approximate launch weight […]