Caguanas River Bridge, Puerto Rico |
| | | • Construction Engineering • Equipment Design • Launch Procedures • Onsite Supervision
| On this project, which was the first curved incrementally launched bridge in North America, CTE staff designed the temporary works including the launching nose and pier tie-back system. The scope also included the setup and launching procedures, as well as on-site supervision.
Caguanas River Bridge, Highway P.R. 10, Utuado, Puerto Rico
• Incrementally launched bridge, 387.5 m long • Maximum launch weight = 11,100 tons • Launched with two 1000 ton hydraulic jacks • Launched uphill against a 4% slope • Final alignment within 3 mm |
|