Caguanas River Bridge, Puerto Rico
 

Construction Engineering
Equipment Design
• Launch Procedures
Onsite Supervision

 

 
On this project, which was the first curved incrementally launched bridge in North America, CTE staff designed the temporary works including the launching nose and pier tie-back system. The scope also included the setup and launching procedures, as well as on-site supervision.
 
Caguanas River Bridge, Highway P.R. 10, Utuado, Puerto Rico
 
      • Incrementally launched bridge, 387.5 m long
      • Maximum launch weight = 11,100 tons
      • Launched with two 1000 ton hydraulic jacks
      • Launched uphill against a 4% slope
      • Final alignment within 3 mm