Paul Lukaszewicz, P.E. – Vice President at Golden State Bridge
“Thanks for the great design. It does not get any more efficient than this” – Seismic retrofit bridge jacking scheme for the Sacramento River Bridges at Red Bluff, CA. All bearings were replaced under live traffic.